The cheapest lead you will ever get, and when to ask for it
Referrals cost a fraction of an advertised lead and close faster, yet most EPCs ask at the wrong moment and get nothing. The timing that works, and the ask.
Topic
How solar EPC teams win rooftop work: quoting with proof, handling objections on site, and closing before the customer collects three more quotations.
Referrals cost a fraction of an advertised lead and close faster, yet most EPCs ask at the wrong moment and get nothing. The timing that works, and the ask.
A factory owner asks different questions from a homeowner and signs for different reasons. What to bring, what they actually worry about, and what kills deals.
Most EPCs give maintenance away for two years and hope nobody calls. What belongs in a priced AMC, what to exclude, and the moment to sell it so it closes.
MNRE has put the vendor-consumer agreement through the PM Surya Ghar portal for consumer approval, with the full installed cost entered and matched to your quote.
Three mechanisms, three very different paybacks, and customers who use the words interchangeably. How to tell them apart before you build a savings table.
Third party owned rooftop went from a fifth of commercial additions to nearly half. What that does to an EPC selling capex, and the arguments that still win.
Accelerated depreciation gives a business 40 percent in year one, but only if the plant runs 180 days in that financial year. Miss it and the rate halves.
C and I buyers are moving on both at once and getting the sequence wrong. Why the roof comes first, what open access is actually for, and how to pitch both.
India added 6.6 GW of rooftop solar in the first half of 2026 and the districts leading it are not the metros. What that does to an EPC's sales geography.
Residential solar loans up to Rs 2 lakh need no collateral, run ten years and carry a six month repayment holiday. Most EPCs still lead with the system price.
Delhi approved zero upfront rooftop solar for homes under 400 units a month. What it does to a Delhi sales pipeline, and which customers it quietly leaves to you.
PM Surya Ghar crossed 50 lakh installations in July 2026. The households left over consume less, own less roof and need finance. What that changes for an EPC.
Two central drafts and a run of state orders all point the same way: net metering gets narrower above 5 kW. What to tell a customer who wants to wait.
The cut moved an EPC contract from 13.8 percent to 8.9 percent. Where that saving actually lands, and why it is a different story for a C and I buyer.
The gap between the site visit and the proposal is where rooftop deals go cold. What to produce on the roof, and what to stop doing back at the office.
What PM Surya Ghar actually pays, when the money lands, and the five places a residential rooftop deal stalls between quotation and subsidy disbursement.